Survey | LJB Inc. https://www.ljbinc.com Civil and Structural Engineering | Environmental and Safety Services Thu, 13 Nov 2025 14:40:59 +0000 en-US hourly 1 https://wordpress.org/?v=6.9 https://www.ljbinc.com/wp-content/uploads/2023/12/cropped-LJB-logo-favicon-32x32.png Survey | LJB Inc. https://www.ljbinc.com 32 32 SwiftAir Hangar https://www.ljbinc.com/project/swiftair-hangar/?utm_source=rss&utm_medium=rss&utm_campaign=swiftair-hangar Thu, 13 Nov 2025 14:40:59 +0000 https://www.ljbinc.com/?post_type=project&p=13069

At Dayton-Wright Brothers Airport, LJB helped bring a vision to life—a new 8,000-square-foot private airplane hangar. The LJB team provided full architectural, civil, structural, and survey services for the facility, which serves as the anchor for new private development at the airport and was thoughtfully designed to meet the owner’s current needs while preparing for […]

The post SwiftAir Hangar first appeared on LJB Inc..]]>
Bodie Island UAV Assistance https://www.ljbinc.com/project/bodie-island-uav-assistance/?utm_source=rss&utm_medium=rss&utm_campaign=bodie-island-uav-assistance Mon, 19 May 2025 16:37:29 +0000 https://www.ljbinc.com/?post_type=project&p=11915

Working as a consultant to NCDOT, LJB’s Chris Dustin provided consulting services for spraying herbicides from a UAS platform to address an invasive species (Phragmites australis) on Bodie Island. These services are performed under the Bodie Island Lighthouse Pond Mitigation project and as part of wetland mitigation impacts associated with the NC 12 Replacement of […]

The post Bodie Island UAV Assistance first appeared on LJB Inc..]]>
Pleasant Valley Road Bridge & Utilities https://www.ljbinc.com/project/pleasant-valley-road-bridge-utilities/?utm_source=rss&utm_medium=rss&utm_campaign=pleasant-valley-road-bridge-utilities Mon, 02 Dec 2024 15:21:25 +0000 https://www.ljbinc.com/?post_type=project&p=10955

Our team served as the prime consultant on this multimodal road and bridge project that replaces a two-lane asphalt road with a four-lane divided concrete road. The design includes two 1,500-foot long bridges, two 130-foot tall City monument towers, two 60-foot tall canopy towers with overlook platforms, and 1.5 miles of trails that form part […]

The post Pleasant Valley Road Bridge & Utilities first appeared on LJB Inc..]]>
Pipeline Relocation along IH 820 https://www.ljbinc.com/project/pipeline-relocation-along-ih-820/?utm_source=rss&utm_medium=rss&utm_campaign=pipeline-relocation-along-ih-820 Mon, 02 Dec 2024 15:02:37 +0000 https://www.ljbinc.com/?post_type=project&p=10949

Our team performed engineering and surveying services for the relocation of a petroleum pipeline along IH 820 at Anderson Road in Haltom City, Texas. Our scope of services included topographic and right-of-way surveying, identifying and resolving utility conflicts, engineering plans for open cut construction and direction drilling, as-built survey and detailed record drawings.

The post Pipeline Relocation along IH 820 first appeared on LJB Inc..]]>
Fish Creek Road & Dechman Drive https://www.ljbinc.com/project/fish-creek-road-dechman-drive/?utm_source=rss&utm_medium=rss&utm_campaign=fish-creek-road-dechman-drive Mon, 02 Dec 2024 14:55:46 +0000 https://www.ljbinc.com/?post_type=project&p=10944

Our team provided surveying, engineering, bidding, and construction administration services for this $4.3 million project to replace 4,800 feet of two-lane asphalt road with a variable width concrete road from I-20 to Belt Line Road. The City did not want to obtain the right-of-way needed to replace the 90-degree bend with a standard centerline radius. […]

The post Fish Creek Road & Dechman Drive first appeared on LJB Inc..]]>
Watson Branch Single Family Phase 2 https://www.ljbinc.com/project/watson-branch-single-family-phase-2/?utm_source=rss&utm_medium=rss&utm_campaign=watson-branch-single-family-phase-2 Mon, 02 Dec 2024 14:50:21 +0000 https://www.ljbinc.com/?post_type=project&p=10938

G&A was hired by Realty Capital Management as the surveyor and engineer on the 116 lot, 34-acre Watson Branch single family development along Watson Branch in Mansfield, Texas. The development also includes dedicated park space with trail improvements. G&A’s services include platting, topographic survey of the site and wooded creek area; civil site design; flood […]

The post Watson Branch Single Family Phase 2 first appeared on LJB Inc..]]>
Kings Island Drive Roadway & Safety Improvements https://www.ljbinc.com/project/kings-island-drive-roadway-safety-improvements/?utm_source=rss&utm_medium=rss&utm_campaign=kings-island-drive-roadway-safety-improvements Wed, 30 Oct 2024 21:02:56 +0000 https://www.ljbinc.com/?post_type=project&p=10848

To support increasing traffic demands, as well as the development of a new, $156 million 60-bed hospital and medical office complex in Mason, LJB designed roadway improvements for this 30-acre site along the I-71 Innovation Corridor. To address the necessary improvements and accommodate the hospital opening, the LJB team employed an “all hands on deck” […]

The post Kings Island Drive Roadway & Safety Improvements first appeared on LJB Inc..]]>
Pipeline Design for DART Cotton Belt Commuter Rail https://www.ljbinc.com/project/pipeline-design-for-dart-cotton-belt-commuter-rail/?utm_source=rss&utm_medium=rss&utm_campaign=pipeline-design-for-dart-cotton-belt-commuter-rail Fri, 27 Sep 2024 19:55:05 +0000 https://www.ljbinc.com/?post_type=project&p=10695

Prior to joining LJB, Grantham & Associates performed pipeline design, construction surveying and as-built drawings for 39,000 linear feet of pipeline relocation. Construction methods included open cut and HDD. The project included relocation of 12-inch refined product pipeline ahead of DART’s 26-mile Cotton Belt “Silver Line” commuter rail project. This large project was completed in […]

The post Pipeline Design for DART Cotton Belt Commuter Rail first appeared on LJB Inc..]]>
Uptown Streetscape Improvements https://www.ljbinc.com/project/uptown-streetscape-improvements/?utm_source=rss&utm_medium=rss&utm_campaign=uptown-streetscape-improvements Thu, 29 Aug 2024 20:59:50 +0000 https://www.ljbinc.com/?post_type=project&p=10469

LJB is leading the Uptown Implementation Plan, which is a detailed and comprehensive set of recommendations to maintain Uptown Centerville as a vibrant district and economic development engine for the city. The plan builds on the vision established in the 2019 Uptown Action Plan and includes private development opportunities, public gathering spaces, streetscapes, parking, and […]

The post Uptown Streetscape Improvements first appeared on LJB Inc..]]>
Geospatial/Survey https://www.ljbinc.com/services/survey-2/?utm_source=rss&utm_medium=rss&utm_campaign=survey-2 Mon, 16 Jan 2023 18:58:21 +0000 https://www.ljbinc.com/?page_id=6611 Geospatial / Survey Contact LJB LJB’s geospatial and survey team includes experts in data collection, reality capture, GIS and asset management. We leverage the latest technology to provide solutions for project planning, management, design and construction. Services Traditional Survey ALTA Boundary Construction staking Topographic Machine control UAS Services Aerial mapping  Inspection  Photogrammetry Thermal imaging Residential […]

The post Geospatial/Survey first appeared on LJB Inc..]]>
Rombach Avenue Improvements https://www.ljbinc.com/project/rombach-avenue-improvements/?utm_source=rss&utm_medium=rss&utm_campaign=rombach-avenue-improvements Mon, 31 Oct 2022 17:04:37 +0000 https://www.ljbinc.com/?post_type=project&p=6364

This project implemented critical safety countermeasures and repaved a 2.19-mile section of Rombach Avenue (US 22), including a one-way street section (eastbound) on a horizontal curve that ties into two-way section. LJB also designed the reconstruction of seven traffic signals, removal of three unwarranted signals, the incorporation of two ramp signals, and the coordination of […]

The post Rombach Avenue Improvements first appeared on LJB Inc..]]>
State of Ohio Computer Center (SOCC) Security Upgrades https://www.ljbinc.com/project/state-of-ohio-computer-center-socc-security-upgrades/?utm_source=rss&utm_medium=rss&utm_campaign=state-of-ohio-computer-center-socc-security-upgrades Tue, 25 Jan 2022 14:54:18 +0000 https://www.ljbinc.com/?post_type=project&p=5307

This project provides the Department of Administrative Services (DAS) with upgraded internal and external security measures at the State of Ohio Computer Center (SOCC) to reduce risk of unauthorized entry onto the SOCC premises. These upgrades, with physical modification and security system enhancements, include vehicular traffic routing modifications, perimeter security barrier modification & enhancements and […]

The post State of Ohio Computer Center (SOCC) Security Upgrades first appeared on LJB Inc..]]>